QEH Tank

This project activity was spurred on by the findings from the Needs assessment. Consultations with the engineering department at the national hospital and the BWA gave key inputs to the geotechnical work and drawings generated. The reports for the geotechnical work were incorporated into the tender and supporting documentation.